Hotel Bathrooms, Europe
gallery

LGS PODS
The client required a showroom bathroom Pod designed, 3D modeled with the concept Pod completed for customer inspection in just 3 weeks
From concept to showroom display made possible with LGS Framer technology
After approval and negotiations with the client & their hotel consultants an order for 270 Bathroom Pods was secured
Multi-Storey
TownHouses
Hi-Rise Facade System
Floor Joists
Wide Span
Bathroom Pods
Houses
POD CAGES ON DEMAND
The key reasons for factory based modular pod construction are;
- Production Line cost savings
- Factory quality control
- Eliminating Trades On-Site
- Factory tested services
- Consistently high finishes
- Short Production program
- Rapid site installation
The bathroom pods after final inspection, are packed, sealed from the environment and can be delivered safe and dry in poor weather conditions
LGS POD Methodology
The Pod Cages are manufactured typically from a C75mm Profile and a narrower wall frame for example C65mm however this narrow section restricts the installation of small bore waste plumbing, typically 50mm pipes, but is still specified to maximise net floor space area
It is recognised Internationally that this profile standardization provides more access for MEP Services and the driver behind specifying 75mm width C Channel Profile, this profile is very robust, logistically travels well, with the addition benefit of increased thermal & acoustic performance
SFS-INTERNATIONAL
FRAMING TECHNOLOGY
The framer machines for LGS Pod Manufacture; we specify our SFS SP120 C75 Framer (C75mm profile)
or our SFS SP120 C65 Framer (C65mm profile) for
LGS POD and Module Frame components