Floor Joist Contract GCC

DOHA - QATAR

LGS Project comprising of 64 Buildings, G + 3 Levels, 2 & 3 bedroom apartments

All the lattice floor joists for the apartments and common access areas manufactured from C89mm & C140mm Profiles

Contract to manufacture and install 62,000 floor joists in less than 7 months, completing a Building LGS Structure in 45 days

Multi-Storey

TownHouses

Hi-Rise Facade System

Floor Joists

Wide Span

Bathroom Pods

Houses

02 Gallery qatar.mini.tl


" Completing a project of this magnitude to meet the completion date would have been impossible with conventional concrete construction"

FAST TRACK CONSTRUCTION

This contract was time critical with a deadline of less than 7 months to install all G + 3 Levels floor joists plus the Roof tapered beams for all 64 Apartment Buildings

The LGS Lattice Beam Floor Joists weighed an average of 55Kg so handling of the floor joists did not require cranes to place into position, a team of only 3 men per apartment manually carried, lifted and placed all the floor joists

The Key benefit of LGS was the speed and handling because the frames, beams are light weight with all LGS work completed in only 45 days