Retail/Warehouse, Italy

RETAIL SHOWROOM

Completed in time for the Summer Season Opening 

A Mill Finish Galvanised Coating was selected to high light the exposed roof trusses in the warehouse & showroom

A mezzanine floor constructed to the front facade for the 1st floor Offices

LGS Integrated with a Galvanised Hot Roll Structure 

Multi-Storey

TownHouses

Hi-Rise Facade System

Floor Joists

Wide Span

Bathroom Pods

Houses

5. gallery roof truss.300x232


" The client wanted the external Galvanised LGS Warehouse Columns to be visual & roof trusses exposed for the retail display showroom"

FAST TRACK CONSTRUCTION

With a light weight LGS Structure a simplified raft slab foundation was possible, completing ready for LGS Framing in only 15 days, LGS Frames placed 5 days later

All Perimeter Wall LGS Frames installed in less than 2 weeks including the LGS warehouse columns

The roof trusses delivered by HIAB Truck, off-loaded, hoisted by the HIAB into position, a scissor lift to connect the Roof Trusses with brackets & Tex Screws, no site welding.
Composite concrete fibre board finish to the external facades and a light weight ribbed roof